Jump to content

Chaudhary Charan Singh International Airport

Coordinates: 26°45′38″N 080°53′25″E / 26.76056°N 80.89028°E / 26.76056; 80.89028
From Wikipedia, the free encyclopedia

Chaudhary Charan Singh International Airport
Summary
Airport typePublic
OwnerAirport Authority of India
OperatorLucknow International Airport Limited[1]
ServesLucknow Metropolitan Region
LocationAmausi, Lucknow, Uttar Pradesh, India
Opened1986; 38 years ago (1986)
Focus city forIndiGo
Elevation AMSL123 m / 404 ft
Coordinates26°45′38″N 080°53′25″E / 26.76056°N 80.89028°E / 26.76056; 80.89028
WebsiteCCSIA Lucknow
Map
LKO/VILK is located in Uttar Pradesh
LKO/VILK
LKO/VILK
Location in Amausi, Lucknow, Uttar Pradesh
LKO/VILK is located in India
LKO/VILK
LKO/VILK
LKO/VILK (India)
LKO/VILK is located in South Asia
LKO/VILK
LKO/VILK
LKO/VILK (South Asia)
LKO/VILK is located in Middle East
LKO/VILK
LKO/VILK
LKO/VILK (Middle East)
LKO/VILK is located in Asia
LKO/VILK
LKO/VILK
LKO/VILK (Asia)
Map
Runways
Direction Length Surface
m ft
09/27 2,744 9,003 PEM
Statistics (April 2023 – March 2024)
Passengers6,184,850 (Increase 18.5%)
Aircraft movements45,549 (Increase 7.7%)
Cargo tonnage20,984 (Increase 32.5%)
Source: AAI[2][3][4]

Chaudhary Charan Singh International Airport (IATA: LKO, ICAO: VILK) is an international airport serving Lucknow, the capital of the Indian state of Uttar Pradesh.[5] It is located in Amausi, 14 km (8.7 mi) from the city centre, and was earlier known as ''Amausi Airport''. It is named after Chaudhary Charan Singh, the fifth Prime Minister of India.[6] It is owned and operated by the Lucknow International Airport Limited (LIAL), a public–private consortium led by Adani Group.

The airport is the 11th busiest airport in terms of passenger traffic in India. It handled around 6.2 million passengers, with more than 45,500 aircraft movements in the fiscal year 2023–2024,[2] and handled around 5.5 million passengers, with 38,494 aircraft movements in the fiscal year 2019–2020. The CCSIA metro station, southernmost station of the Red Line, lies in front of Terminal-2. Due to the COVID-19 pandemic, passenger traffic declined by 55.1% in the FY 2020-2021 and aircraft movements by 40.4% in the same year. The airport has three operational terminals, of which Terminal 3 was inaugurated and opened by Prime Minister Narendra Modi on 10 March 2024.[7][8]

History

[edit]

The airport was constructed in 1986 to facilitate service to corporate and government officials. With an increasing number of passengers, demand, traffic and airlines, the Airports Authority of India (AAI) decided to upgrade and expand the airport in 1996.[9] On 17 July 2008, the Government of India officially renamed the airport to Chaudhary Charan Singh International Airport, after Chaudhary Charan Singh, the fifth Prime Minister of India.[10]

The second terminal, Terminal 2, was then built in 2012 to handle the increasing domestic traffic.[9] It was inaugurated by the then Minister of Civil Aviation, Ajit Singh, and granted international status on 19 May 2012. It covers an area of 17,000 m2 (180,000 sq ft) with two aerobridges, and is equipped with all basic and modern facilities and amenities.[11] The announcement of a new passenger terminal, Terminal 3, at the airport was made in 2016 by the then Minister of Civil Aviation, Suresh Prabhu, owing to the growing traffic and demands for more international flights and destinations. In 2018, the Government of India approved the new Terminal 3, to be built in two phases at a cost of about 2,400 crore (US$280 million).[12] The terminal's first phase began construction in February 2018, and was expected to be completed by December 2021.[13] However, due to the COVID-19 pandemic, which caused shortage of labour and slowdowns in work, it got delayed, and was expected to be completed by December 2023.[14][15] It was completed and inaugurated by Prime Minister Narendra Modi on 10 March 2024. It covers an area of 111,367 m2 (1,198,740 sq ft), has seven aerobridges and three floors, including the first floor for departures, the second floor for arrivals and a large basement of 20,461 m2 (220,240 sq ft). An elevated four-lane approach road corridor links Terminals 2 and 3 with the city through National Highway 27 (NH-27), which connects Lucknow with Kanpur, of 6,646 m2 (71,540 sq ft) covering about 1.8 km (1.1 mi). The terminal is be capable of serving over 13 million passengers annually. It is designed to match the local culture and heritage, and has been built on the lines of Frankfurt Airport in Frankfurt, Germany to match its modern, developed and advanced technological amenities and features. The second phase of the terminal will be extended eastwards by demolishing the existing Terminal 1 between Terminals 2 and 3.

In February 2019, the Adani Enterprises led–Lucknow International Airport Limited (LIAL) won the rights of operations, management and development of the airport under the public-private partnership (PPP) model.[16] As per the agreement, the airports would be handed to the company for a period of 50 years at the highest bid of ₹ 171 per passenger. The company will pay the per-passenger fee (PPF) to the AAI for every domestic and international passenger handled at the airport.[17]

Facilities

[edit]

Runway

[edit]

The airport has one runway oriented 09/27, with a length of 2,744 m (9,003 ft) and a width of 60 m (200 ft). It has an ILS CAT IIIB capability on the eastern threshold, which enables landing in low visibility and abnormal weather conditions. Along with the airport, Delhi, Bangalore, Kolkata, Jaipur, and Amritsar are the only 6 airports in India with ILS CAT IIIB which helps flights land safely, even with visibility as low as 50 metres.[18] As of March 2024, the runway is being revamped to handle more flights and bigger aircraft like the Airbus A350 and Boeing 787. It will have new ground lights for aircraft operations, introduction of three new link taxiways and extension of the runway end safety area (RESA).[19]

Other facilities The airport has many facilities to give passengers and visitors a smooth and hassle-free experience. To connect with travel services and customised packages through the airport's staff, it offers the 'Pranaam Meet and Greet Service' a specialised service that offers customised packages and an array of services to meet travellers' requirements, including professional assistance to corporate clients and support to group travellers, senior citizens and solo travellers.[20]

Pranaam Meet and Greet Service

[edit]

To connect with travel services and customised packages through the airport's staff, it offers the 'Pranaam Meet and Greet Service', a specialised service that offers customised packages and an array of services to meet travellers' requirements, including professional assistance to corporate clients and support to group travellers, senior citizens and solo travellers.[21]

Other facilities include in-line baggage handling systems, conveyor belts, booking counters, immigration and emigration counters, check-in kiosks, CCTVs, washrooms, ATMs, restaurants, lounges, multiple retail stores and souvenir shops, lost and found service, free WiFi, prayer rooms, child care facilities, cargo services, medical and emergency facilities, facilities for physically challenged passengers, duty free, porter service, foreign exchange counters and tourist information desks.[22]

Terminals

[edit]

Terminal 1

[edit]

The original terminal, built in 1986 to cater government and private officials and flights, has been designed to complement the architecture of Lucknow Charbagh railway station. It has two arrival and three departing gates as well as two immigration counters. The terminal was expanded in 1996. It is currently used for only international flights after the opening of Terminal 2 in 2012.[23] It has only basic facilities available to cater to the needs of passengers. It will be demolished in the second phase of the airport expansion project to link Terminals 2 and 3.[24]

Terminal 2

[edit]
Terminal 2 visiting lobby

Terminal 2 had been built to become the international terminal and serve the growing traffic and demands. However, considering the large domestic travel demand, it was later decided to be used only for domestic flights. Renowned for its design, the terminal's elevation to the sky resembles the folded wings of a paper plane. Large wing-like cantilevers on either side of the 200 m (660 ft)-long roof depict vibrancy and swiftness. The building itself appears as a dynamic object preparing to take flight. Inside, the gently curving ceiling gives the feeling of being under the belly of a giant aircraft. The design of the building does not labour to represent the culture and heritage of the city, instead gets imprinted with the architects' own experiences of nightmares about an aircraft crashing down through the roof, the exhilaration of flight, lightness, the indented front of the city as it wraps around the Gomti River and the ruins of the British Residency after the mutiny of 1857. Frosted etchings on the glass façade of the building bear the intricate patterns of Chikankari, the famous embroidery work of Lucknow.[25] The terminal was inaugurated by then Minister of Civil Aviation, Ajit Singh, on 19 May 2012, before opening on 2 June 2012.[26]

Covering an area of 17,000 m2 (180,000 sq ft), the terminal can handle 1,200 passengers per hour and around 4 million passengers per year.[27] The terminal was being used more than its capacity which led the Lucknow International Airport Limited (LIAL), the owner of the airport headed by Adani Group, increasing the passenger handling capacity per hour by 200 passengers.[28] The terminal was refurbished by the Adani Group in 2022 after their takeover in 2020, as per its plan to refurbish terminals of airports taken over from the Airports Authority of India (AAI). After the commissioning of Terminal 3, the pressure on Terminal 2 has been significantly relieved. It is also likely that the Terminal 2 will be converted into an administrative building for airport operations.[29]

Terminal 3

[edit]

In 2018, Suresh Prabhu, the then Minister of Civil Aviation, announced that a new third passenger terminal building will be constructed with an area of 111,362 m2 (1,198,690 sq ft), including a basement area of 20,461 m2 (220,240 sq ft) and a connecting corridor between Terminals 2 and 3, which will cover an area of 6,646 m2 (71,540 sq ft). To be built in two phases, the first phase will be able to serve more than 13 million passengers annually. It has been built at a cost of 1,383 crore (US$160 million), which is now estimated at 2,400 crore (US$280 million).[12] The Peak-Hour Handling (PHP) capacity of the new terminal is 4,000 passengers, of which 3,200 is domestic and 800 international.[30] There are a total of 75 check-in counters, of which 60 are for domestic and 15 for international passengers, and 18 check-in kiosks for passengers travelling through the terminal.[31] It is equipped with six aerobridges, which will be increased to eight after the completion of the second phase, through which the passengers can board directly to the flight from their respective boarding gates.[31] It has 30 lifts and 5 escalators.[31] In January 2018, the construction of the terminal building was started by Nagarjuna Construction Company (NCC). All design and interiors have been designed based on the Frankfurt Airport in Frankfurt, Germany, by the British architectural firm, Pascall+Watson. The second phase, which includes the extension of part of Terminal 3 after demolition of Terminal 1 and constructing a connecting corridor between Terminals 2 and 3 will be completed in the next five years.[24] On 25 February 2019, the Adani Group was awarded with the operations and expansion of the existing as well as the new Terminal 3.[32][33] It is a multi-storeyed terminal building with departures at the first floor and arrivals at the ground floor. The terminal's architecture will endeavour to express the position of Lucknow as a key city and will display the traditional culture and heritage of Uttar Pradesh. The building is also provided with interior decorations to match the modern structure and enhance passenger experience.[34] Along with the terminal, a multi-storey parking facility is also under construction, which will have a parking of 1,500 vehicles. Also, over 5 km (3.1 mi) of storm water drains have been constructed parallel to the runway on either side to facilitate the outflow of the water into the Bijnor Canal. Terminal 3 was inaugurated and opened by Prime Minister Narendra Modi on 10 March 2024.[7][29]

Cargo terminal

[edit]

It was opened in March 2022. The facility has increased the cargo handling capacity of the airport by 40 per cent to 7000 tonnes per year. The airport has also increased to over 1000 tones per month by the end of FY 2022–2023. At present, e-commerce, courier, post office mails, general cargo, valuables, mobile phones, and perishables are exported as well as imported at the airport. The airport is also in talks with various multi-national companies to use the airport as a regional distribution hub.[35] A new integrated cargo terminal with a capacity of 30,000 tonnes is planned at the airport by the administration.

Airlines and destinations

[edit]
AirlinesDestinations
AirAsia Kuala Lumpur–International[36]
Air India Delhi, Mumbai
Air India Express[37] Bangkok–Suvarnabhumi,[38] Bengaluru, Bhubaneswar (begins 3 January 2025),[39] Dammam,[40] Delhi, Dubai–International, Hyderabad, Kochi, Mumbai, Muscat,[40] Pune,[41] Ras Al Khaimah
Akasa Air Ahmedabad, Bengaluru, Mumbai[42]
FlyBig[43] Aligarh, Azamgarh, Chitrakoot, Moradabad, Shravasti
flydubai Dubai–International
Flynas Dammam, Riyadh
IndiGo Abu Dhabi,[44] Ahmedabad, Aurangabad,[45] Bengaluru, Bhopal,[46] Chandigarh, Chennai, Dammam, Dehradun, Delhi, Goa–Dabolim, Guwahati, Hyderabad, Indore, Jaipur, Kolkata, Mumbai, Patna, Prayagraj, Pune, Raipur,[47] Ranchi,[48] Sharjah, Varanasi[49]
Jet Serve AviationLakhimpur Kheri[50]
Oman Air Muscat
SalamAir Muscat[51][52]
Saudia Jeddah, Riyadh
Star Air Hyderabad (begins 1 January 2025),[53] Jharsuguda (begins 1 February 2025),[54] Kishangarh[55]
Thai AirAsiaBangkok–Don Mueang[56]

Statistics

[edit]
Annual passenger traffic at LKO airport. See Wikidata query.

Future

[edit]

Airport expansion

[edit]
  • The runway expansion from 2744 m to 3500 m will start from 18 April and will last until 11 July.[57]
  • The Adani Group will invest Rs 10,700 crore into Lucknow Airport's expansion so that its annual passenger handling capacity zooms from 4 million passengers per annum (MPPA) to 39 MPPA.
  • The airport's expansion plan received clearance from the Union Environment Ministry on 15 December. However, the plan submitted to the ministry did not mention the deadline for the expansion.
  • The plan of Lucknow International Airport Limited (LIAL), an Adani group company, said: "CCSIA (Chaudhary Charan Singh International Airport) in Lucknow has a total land area of 509.41 hectares (1258.80 acres), making it one of the most land-constrained airports in India." LIAL now proposes expansion of CCSIA within an area of 457.1 hectares, it added.
  • Along with Terminal 3, a new terminal building (Terminal 4), 3 parallel taxiways along the runway with associated infrastructure, support facilities, and utilities will be built to accommodate 39 MPPA, the plan noted.
  • Total built up area for Terminal 4 along with Terminal 3 modification would be 4,26,131 square meter whereas the total footprint area of Terminal 4 and Terminal 3 modification would be 1,39,020 square meters [58]
  • LIAL's plan said a cargo complex would be developed at CCSIA in a total area of 23.14 hectares to handle cargo up to 0.25 million tonnes per annum.
  • During its construction phase, the expansion project will employ about 2,000 people directly and indirectly, and once operational, about 25,000 people will be employed, the plan said.
  • A multi-modal transport hub — which includes metro connectivity, multi-level car parking, cityside check-in and self-bag drop facility, and curbside facilities for passengers/visitors arriving at the airport from surrounding areas — will also be developed, it said.
  • LIAL has proposed multi-level car parking to accommodate 4,000 car spaces, the plan noted.
  • "Pedestrian walkways are planned to connect multi-level car parking to terminal departure and arrival areas, for passengers and greeters to park in multi-level car parking and walk down to the pick-up/drop off kerbs," it mentioned.
  • About 9.6 million litres per day (MLD) of water would be required to handle 39 MPPA, it said. 4.5 MLD will be supplied by the Uttar Pradesh government or borewells and the remaining 5.1 will be sourced from the sewage treatment plant for landscaping and flushing, it added.[59]
  • New integrated cargo terminal with a capacity of 30,000 tonnes, new fuel storage facility with 5,000 KL capacity are among other key initiatives that have been planned at the Lucknow International Airport by the administration.[29]

Aerocity

[edit]

A concession Agreement for Operation, Maintenance, Management & Development of Airside and Landside area of Chaudhary Charan Singh International Airport (CCSIA) has been signed between Airports Authority of India (AAI) and Lucknow International Airport Limited (LIAL) (earlier known as Adani Lucknow International Airport Limited) on 14 February 2020. As a part of concession agreement between AAI & LIAL, 110 acres has been allotted to LIAL for City Side development. Adani Airport Holdings Limited has been granted rights to undertake development, operation, management and maintenance of City Side of Chaudhary Charan Singh International Airport (CCSIA) Airport vide a Master Services Agreement dated 18 May 2021 ("MSA") executed between Lucknow International Airport Limited (LIAL) and Adani Airport Holdings Limited and is authorised to obtain required approvals from statutory authorities.

Out of the total land area available for City Side Development. M/s Adani Airport Holdings Limited proposes its phase-I development, on plot area of about 15.36 acres, i.e. 62,182.69 sqm and Built-up area of 3,47,423 sq. m, for which Environment Clearance is being sought. Under the provision of EIA notification 2006, amended until date.

The project is a mixed-use development that comprises the following:

  • Retail space (Multiplex, Entertainment, Virtual Reality, and F&B)
  • Business Centre (Convention Center and Flexi Office)
  • Hotel
  • Associated connectivity, utilities and facilities

The total population of project will be 31,108 persons.

Adequate provision will be made for the heavy vehicle parking at the project site to allow smooth movement at the site. The proposed parking area will be 4087 ECS.

The total project cost of the proposed City Side Development project is 1116.50 crores.

The Aero City will be constructed between the new Terminal 3 and the CCSIA Metro Station. Estimated date of completion for the project is 2026.[60][61]

Ground transport

[edit]

Railways

[edit]

Amausi railway station is one of the suburban railway stations of Lucknow. It lies on the Lucknow - Kanpur Suburban Railway Line and is just 7 km (4.3 mi) from the airport.

Metro

[edit]
CCSIA Metro Station

CCSIA and Amausi are the metro stations on the Red Line of the Lucknow Metro that connects the airport to the rest of the city.

  • CCSIA metro station is situated at the front of the Terminal 2.
  • Amausi metro station is situated at just 1 km from the Terminal 2.

Local buses

[edit]

The Lucknow City Transport Services supplies the Air-Conditioned and Non-AC buses from the Airport to the Charbagh Railway Station as well as the rest of the city.

Local taxis

[edit]

The Ola Cabs, Uber, Rapido, inDrive, and Lucknow Taxi are available at the Airport Taxi stand-in entranceway. Passengers can book four-wheeler, three-wheeler, and Two-wheeler taxis from the taxi stand.

Awards

[edit]
Terminal 2, CCS International Airport
  • The airport was awarded AAI's "Best Airport" award in July 2013 along with Jodhpur Airport.[62]
  • Lucknow Airport was rated second-best in the category of small airports catering to 5–10 million passengers per annum by Airports Council International, a global non-profit organisation of airport operators.[63]
  • In 2018, Lucknow Airport was awarded the best airport in the category "Best Airport by Size and Region (2–5 million passengers per year in Asia-Pacific Region)" by the Airports Council International.[64]
  • The Passenger Terminal 2 Building's Architects, S. Ghosh & Associates were awarded the NDTV-Grohe Infrastructure Architecture Design of the Year Award in 2014 for the project.[65]
  • In 2019, the Airport was awarded first position in ASQ awards in Asia Pacific region for 5 to 15 million capacity pet annum by Airport Council International (ACI).[66]
  • In January 2021, Lucknow Airport was accredited in the Airports Council International (ACI) Airport Health Accreditation programme. The global recognition demonstrates extraordinary proactive measures put in place by the airport to ensure passenger safety.[67]
  • In January 2023, Assocham announced the best regional airport awards for Lucknow and Ahmedabad airports.[68]

See also

[edit]

References

[edit]
  1. ^ "Lucknow International Airport". cbonds.com. Retrieved 7 March 2023.
  2. ^ a b "Annexure III – Passenger Data" (PDF). aai.aero. Retrieved 20 April 2024.
  3. ^ "Annexure II – Aircraft Movement Data" (PDF). aai.aero. Retrieved 20 April 2024.
  4. ^ "Annexure IV – Freight Movement Data" (PDF). aai.aero. Retrieved 20 April 2024.
  5. ^ "Lucknow Airport". AAI. Archived from the original on 11 August 2020. Retrieved 21 August 2020.
  6. ^ "Chaudhary Charan Singh, The 5th Prime Minister of India". My Nation. Asianet News Network Pvt Ltd. Archived from the original on 4 August 2020. Retrieved 27 August 2020.
  7. ^ a b "PM Modi inaugurates T3 of Lucknow airport along with 5 other airports in Uttar Pradesh". The Times of India. 12 March 2024. Retrieved 16 March 2024.
  8. ^ "Passenger convenience hallmark of Lucknow airport's new terminal". The Hindustan Times. 11 March 2024. Retrieved 16 March 2024.
  9. ^ a b "Lucknow Airport- Chaudhary Charan Singh International Airport, Lucknow – Lucknow Travel Guide". Archived from the original on 3 February 2016. Retrieved 6 March 2016.
  10. ^ Sinha, Saurabh (17 July 2008). "Airport to be named after Charan Singh?". The Times of India. ISSN 0971-8257. Retrieved 25 October 2023.
  11. ^ "The Times Of India". 4 August 2012. Archived from the original on 13 October 2015. Retrieved 21 August 2014.
  12. ^ a b "Govt nod for 3 new airport terminal buildings at Chennai, Lucknow and Guwahati – Times of India". The Times of India. Timesofindia.indiatimes.com. 2 May 2018. Archived from the original on 3 May 2018. Retrieved 3 May 2018.
  13. ^ "Construction of New Integrated Passenger Terminal Building at C.C.S. International Airport, Lucknow". Airports Authority of India. Retrieved 16 March 2024.
  14. ^ Chauhan, Arvind (2 September 2020). "Lucknow: Pandemic delays work on swanky Terminal 3 at CCS Airport by a year". The Times of India. Retrieved 16 March 2024.
  15. ^ Agarwal, Priyangi (21 January 2023). "Delhi-Meerut RRTS corridor on track for June 2025 completion". The Times of India. Retrieved 18 February 2024.
  16. ^ PTI (22 October 2020). "Adani To Take Over Airport Ops At Mangaluru, Lucknow, Ahmedabad Soon". NDTV. Archived from the original on 1 November 2020. Retrieved 2 November 2020.
  17. ^ "Airport makeover: No takeoff in sight for Adani operations". The Financial Express. 23 August 2020. Archived from the original on 7 September 2020. Retrieved 7 September 2020.
  18. ^ "Airport ready to facilitate landing in 50 m visibility | Lucknow News – Times of India". Timesofindia.indiatimes.com. 9 December 2016. Archived from the original on 7 September 2018. Retrieved 3 May 2018.
  19. ^ "Lucknow international airport will remain closed for night flight operations for four months". The Times of India.
  20. ^ "Pranaam Meet and Greet Service". Adani Group. Retrieved 3 February 2024.
  21. ^ "Pranaam Meet and Greet Service". Adani Group. Retrieved 16 March 2024.
  22. ^ "Airport Services". Adani Group. Retrieved 16 March 2024.
  23. ^ "Swanky Amausi ready for take-off after a month". The Times of India. 17 December 2011. Archived from the original on 4 November 2013.
  24. ^ a b "Pandemic delays work on swanky Terminal 3 at CCS Airport by a year". 3 September 2020. Archived from the original on 4 September 2020. Retrieved 3 September 2020.
  25. ^ Rosenfield, Karissa (29 May 2012). "New Terminal at Lucknow Airport / S. Ghosh & Associates". ArchDaily. Retrieved 1 August 2023.
  26. ^ "New Terminal at Lucknow Airport". Airport International. 31 May 2012. Archived from the original on 1 June 2012.
  27. ^ "Airports Authority of India". Archived from the original on 15 September 2014.
  28. ^ "छोटा पड़ रहा लखनऊ एयरपोर्ट का घरेलू टर्मिनल, 200 यात्रियों की क्षमता बढ़ाने का फैसला".
  29. ^ a b c "Lucknow airport to undergo Rs 5,000 crore upgrade, get new terminal". The Times of India. 2 March 2023.
  30. ^ "Domestic Projects | AIRPORTS AUTHORITY OF INDIA". Aai.aero. 17 August 2017. Archived from the original on 14 June 2021. Retrieved 21 December 2021.
  31. ^ a b c "लखनऊ एयरपोर्ट का नया टर्मिनल तीन साल में, ये सुविधाएं होंगी खास". Dainik Jagran (in Hindi). Retrieved 3 November 2022.
  32. ^ Manoj, Ashwini Phadnis & P. (25 February 2019). "Adani lands 5 airports with winning bids". @businessline. Archived from the original on 14 November 2019. Retrieved 26 January 2020.
  33. ^ "Adani group wins bids to operate five airports". 25 February 2019. Archived from the original on 8 November 2020. Retrieved 26 January 2020.
  34. ^ Pascall+Watson / redboxmedia. "Chaudhary Charan Singh International Airport, New Terminal • Aviation • Work • Pascall+Watson". Pascalls.co.uk. Archived from the original on 31 August 2021. Retrieved 21 December 2021.
  35. ^ "Lucknow Airport Gets New Facility for Inbound Cargo | Lucknow News". The Times of India. 12 March 2022.
  36. ^ Liu, Jim (20 June 2024). "AIRASIA PLANS LUCKNOW SEP 2024 LAUNCH". Aeroroutes. Retrieved 20 June 2024.
  37. ^ "Our network–Where we fly". Air India Express. Retrieved 2 May 2024.
  38. ^ "Good news for travellers! Air India Express to launch new direct flight from Lucknow to Bangkok". Knock Sense. Retrieved 12 December 2024.
  39. ^ "Air India Express to Add Three New Routes from Bhubaneshwar". aviationa2z. Retrieved 24 November 2024.
  40. ^ a b "Air India Express expands flights from Lucknow". AviationAll. Retrieved 24 January 2024.
  41. ^ "AirAsia India to commence Lucknow-Pune service in May-2023". CAPA. Retrieved 19 April 2023.
  42. ^ "Akasa Air Flight Network". Akasa Air. Retrieved 30 June 2023.
  43. ^ "Flight Schedule" (PDF). FlyBig. Retrieved 16 March 2024.
  44. ^ "IndiGo adds flights to Abu Dhabi, Dubai from Lucknow". Economic Times. 30 June 2023. Retrieved 30 June 2023.
  45. ^ Darkunde, Mahesh (24 May 2024). "IndiGo Launching New Flights from Goa to Aurangabad and Nagpur". Aviation A2Z. Retrieved 26 May 2024.
  46. ^ "IndiGo to Resume Bhopal to Lucknow Flight From March 31". Free Press Journal. Retrieved 28 February 2024.
  47. ^ "IndiGo to resume Lucknow-Raipur-Bhubaneswar service from Jun-2023". CAPA. Retrieved 22 May 2023.
  48. ^ "Ranchi to get direct flights to Lucknow, Bhubaneswar". Archived from the original on 3 August 2021. Retrieved 3 August 2021.
  49. ^ "CM Adityanath inaugurates first flight service between Lucknow, Varanasi". Press Trust of India. 10 August 2023. Retrieved 10 August 2023.
  50. ^ https://www.amarujala.com/amp/uttar-pradesh/lakhimpur-kheri/air-service-started-from-lucknow-to-palia-four-hours-journey-can-be-completed-in-40-minutes-lakhimpur-news-c-120-1-lkh1010-133910-2024-11-26
  51. ^ "Our Network & Routes". SalamAir. Retrieved 23 November 2023.
  52. ^ Cherian, Dona (21 November 2023). "Oman's SalamAir launches routes to five destinations in India". Gulf News. Retrieved 23 November 2023.
  53. ^ "Star Air new routes".
  54. ^ "Star Air to start services from J'guda airport in Jan". Times of India. 7 December 2024. Retrieved 7 December 2024.
  55. ^ "Star Air expands its network with new flights from Ajmer to Lucknow". ET TravelWorld. 29 February 2024. Retrieved 1 March 2024.
  56. ^ "Thai Air Asia to Lucknow". Retrieved 23 October 2022.
  57. ^ "Lucknow Airport Terminal-3 Update: Night Operations to Remain Suspended from This Date for Three Months". 14 March 2024.
  58. ^ "Downloads | Lucknow International Airport".
  59. ^ "Adani group to invest Rs 10,700 crore to expand Lucknow airport". 18 December 2022.
  60. ^ "Adani Group plans to build aero cities near its airports". 15 July 2022.
  61. ^ "Report Part 1(FORM - B)". environmentclearance.nic.in. Retrieved 18 February 2023.
  62. ^ "Airports Authority of India" (PDF). 23 January 2014. Archived from the original (PDF) on 23 January 2014. Retrieved 26 January 2020.
  63. ^ "Lucknow airport judged second-best in small airport category – Times of India". The Times of India. 3 March 2016. Archived from the original on 6 January 2017. Retrieved 6 March 2016.
  64. ^ "Asia-Pacific". Aci.aero. Retrieved 3 May 2018.
  65. ^ "Infrastructure Architecture Design of the Year (Sports, Transport, Bridges)". NDTV Design And Architecture Awards 2017. 17 July 2015. Archived from the original on 11 July 2019. Retrieved 27 August 2020.
  66. ^ "Proud achievement! Delhi, Mumbai, Bengaluru, 6 other Indian airports bag awards for World's best airports". The Financial Express. 11 March 2020. Archived from the original on 25 August 2020. Retrieved 27 August 2020.
  67. ^ "Three Adani Airports including Mangaluru awarded ACI Airport Health Accreditation for safe travel". Daijiworld.com. 18 January 2021. Archived from the original on 30 January 2021. Retrieved 21 December 2021.
  68. ^ "We are looking to acquire new airports through govt bids: Adani Airports CEO". Business Insider.
[edit]