Jump to content

Line 13 (Shenzhen Metro)

From Wikipedia, the free encyclopedia
(Redirected from Line 13, Shenzhen Metro)
Line 13
Overview
Other name(s)Shiyan Line
(石岩线; 石岩線; shíyán xiàn)
StatusOperational
LocaleBao'an and Nanshan districts
Shenzhen, Guangdong
Termini
Stations7
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)MTR Corporation (Shenzhen)[1]
History
Opened28 December 2024; 14 days ago (2024-12-28) (Phase 1 South section)[2]
Technical
Line length6.36km (Phase 1 South)
22.5km (Phase 1 total)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead Line, 1,500 V DC
Operating speed100 km/h (62 mph)
Route map

Gongming North
Xiacun
Changchun Road
Gongming Square
Gongming South
Dongzhou Road
Gongming Depot
Yueliang Road
Fenghuang Town
Tongguan Road
6B to SIAT Right arrow
Guangmingcheng
Guangming Central Hospital
Up arrow Phase 2 (Northern Extension)
Phase 1 Down arrow
Shangwu
Shiyan
Luozu
Yingrenshi
Baiwang · HKU
Liuxiandong
Shigu
Xili railway station
Hi-Tech North
Hi-Tech Central
1 to Luohu Right arrow
Shenzhen University
Yuehaimen
Keyuan
Houhai
Talent Park
Neihu Stabling Yard
Shenzhen Bay Checkpoint
Up arrow Phase 1
Phase 2 (Southern Extension) Down arrow
Sunrise Amphitheatre
Opera House
Dongjiaotou

Line 13 of the Shenzhen Metro is one of the four new metro lines of the metro's Phase IV expansion under construction in the city of Shenzhen, Guangdong.[3][4] The 6.36km Phase 1 South section between Shenzhen Bay Checkpoint and Hi-Tech Central opened on December 28, 2024,[2] with the rest of Phase 1 and the northern extension expected to be completed and operational in 2025, and the southern extension in 2026. The first phase of the line is 23 km (14 mi) long and uses eight car type A trains with a maximum operating speed of 100 km/h (62 mph).[5] Like Line 4, Line 13 is operated by MTR Corporation (Shenzhen).

History

[edit]

Timeline

[edit]
Segment Commencement Length Station(s) Name
Shenzhen Bay Checkpoint — Hi-Tech Central 28 December 2024[2] 6.36 km (3.95 mi) 7 Phase 1 South
Hi-Tech Central — Shangwu To be determined 16.1 km (10.00 mi) 9 Phase 1 North
Shangwu — Lisonglang To be determined 18.8 km (11.68 mi) 11 Phase 2 North

Stations

[edit]
Stage Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Phase 2 (Southern Extension)[6] Dongjiaotou 东角头 2 8 Nanshan
Opera House 歌剧院
Tide Park 潮汐公园
Phase 1

(South Section)[5][7][8]

Shenzhen Bay Checkpoint 深圳湾口岸
Talent Park 人才公园
Houhai 后海 2 8 11
Keyuan 科苑 2 8
Yuehaimen 粤海门 9
Shenzhen University 深大 1  20 
Hi-Tech Central 高新中
Phase 1

(North Section)

Hi-Tech North 高新北
Xili High Speed Railway Station 西丽高铁站 China Railway High-speed ELQ
 15   27   29 
Shigu 石鼓
Liuxiandong 留仙洞 5
Baiwang · HKU 百旺港大
Yingrenshi 应人石 Bao'an
Luozu 罗租
Shiyan 石岩
Shangwu 上屋 6
Phase 2 (Northern Extension) Hong'ao Park 红坳公园 Guangming
Guangmingcheng 光明城  6B  Guangmingcheng railway station IMQ
Deya Road 德雅路
Fenghuang Town 凤凰城 6
Yueliang Road 月亮路
Jiangwei 将围
Xinzhuang 新庄
Gongming Square 公明广场 6
Shangcun 上村
Xiacun 下村
Lisonglang 李松蓢

References

[edit]
  1. ^ "港铁咨询公司联合体中标深圳市轨道交通13号线公私合营项目". 2020-08-03.
  2. ^ a b c "定了!深圳地铁13号线南段明日开通" [It’s settled! The southern section of Shenzhen Metro Line 13 will open tomorrow]. Shekou News (in Simplified Chinese). 2024-12-27. Retrieved 2025-01-11.
  3. ^ "WORK ON 4 NEW METRO LINES TO START THIS YEAR". Shenzhen Daily. 9 February 2017. Retrieved 9 February 2017.
  4. ^ "Metro lines to connect with Dong guan and Hui zhou". The Nanfang. 11 December 2016. Retrieved 9 February 2017.
  5. ^ a b 深圳地铁12、13、14、16等5条线明天开工,5年建成. news.sina.com.cn. 9 January 2018. Retrieved 2018-03-07.
  6. ^ "未来可坐地铁18号线去"农批"买菜---晶报多媒体数字报刊平台". Archived from the original on 2014-02-22.
  7. ^ "Shenzhen metro official website". www.szmc.net. Retrieved 9 February 2017.
  8. ^ http://www.ndrc.gov.cn/zcfb/zcfbghwb/201707/W020170712339982329520.pdf. {{cite web}}: Missing or empty |title= (help)