Jump to content

Line 7 (Zhengzhou Metro)

From Wikipedia, the free encyclopedia
Line 7
 7 
Overview
StatusUnder construction
OwnerZhengzhou
LocaleZhengzhou, Henan, China
Termini
Stations21 (1 under planning)
Service
TypeRapid transit
SystemZhengzhou Metro
Operator(s)Zhengzhou Metro Group Corporation
History
Opened29 December 2024; 0 days ago (2024-12-29)
Technical
Line length26.8 km (16.65 mi)[1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts)

Line 7 of Zhengzhou Metro (Chinese: 郑州地铁7号线; pinyin: Zhèngzhōu Dìtiě Qīhào Xiàn) is a rapid transit line in Zhengzhou that runs in a north - south direction. The line uses six car Type A trains.[2] The line is opened in 29 December 2024.[3]

Opening timeline

[edit]
Segment Commencement Length Station(s) Name
Dongzhao - Nangangliu 29 December 2024[3] 26.8 km (16.7 mi)[1] 20 Phase 1
Huanghe Bolanguan - Dongzhao TBD 2.5 km (1.6 mi) 1 Northern extension

Stations

[edit]
Station
No.
Station name Connections Distance
km
Location
English Chinese
0701 Huanghe Bolanguan 黄河博览馆 Huiji
0702 Dongzhao 东赵
0703 Huanghe Yingbinguan 黄河迎宾馆  2 
0704 Bei Daxuecheng 北大学城
0705 Liulisi 琉璃寺 Jinshui
0706 Zhangjiacun 张家村  4 
0707 Chenzhai 陈砦
0708 Baimiao 白庙  8 
0709 Nongye Daxue 农业大学
0710 Zhengzhou People's Hospital 郑州人民医院  5 
0711 Dashiqiao 大石桥  3 
0712 Zhengda Yifuyuan 郑大一附院 Erqi
0713 Yixueyuan 医学院  1   10 
0714 Shi Guke Yiyuan 市骨科医院
0715 Daxue Zhonglu 大学中路  6 
0716 Zhengzhou No.2 People's Hospital 市第二人民医院  5 
0717 Wanghuzhai 王胡砦
0718 Lijiang Lu 漓江路
0719 Jinghu 荆胡
0720 Nanhuan Gongyuan 南环公园
0721 Nangangliu 南岗刘

References

[edit]
  1. ^ a b "郑州地铁7、8号线一期票价出炉". 2024-11-10. Retrieved 2024-11-30. 7号线一期工程建设线路起于东赵站,止于南岗刘站,线路全长约26.8km,均为地下线,设车站20座
  2. ^ "郑州市轨道交通7号线一期工程车辆牵引系统招标项目评标结果". 2021-06-20. Retrieved 2024-11-30.
  3. ^ a b "郑州市轨道交通7号线一期、8号线一期明日正式开通". 28 December 2024. Retrieved 29 December 2024.